CSF CONTRACTORS were engaged by Catcon to construct the pile caps for the wind turbines at Gullen Wind Farm in the ACT.
Name of Project | Gullen Wind Farm |
---|---|
Project Owners | CATCON |
Location | ACT |
Duration | |
Tonnes of Steel | |
Concrete m3 |
CSF CONTRACTORS were engaged by Catcon to construct the pile caps for the wind turbines at Gullen Wind Farm in the ACT.
Name of Project | Gullen Wind Farm |
---|---|
Project Owners | CATCON |
Location | ACT |
Duration | |
Tonnes of Steel | |
Concrete m3 |