
CSF CONTRACTORS were engaged by Catcon to construct the pile caps for the wind turbines at Gullen Wind Farm in the ACT.
| Name of Project | Gullen Wind Farm | 
|---|---|
| Project Owners | CATCON | 
| Location | ACT | 
| Duration | |
| Tonnes of Steel | |
| Concrete m3 | 

CSF CONTRACTORS were engaged by Catcon to construct the pile caps for the wind turbines at Gullen Wind Farm in the ACT.
| Name of Project | Gullen Wind Farm | 
|---|---|
| Project Owners | CATCON | 
| Location | ACT | 
| Duration | |
| Tonnes of Steel | |
| Concrete m3 | 
 All Projects